{"id":112,"date":"2023-08-09T14:58:44","date_gmt":"2023-08-09T14:58:44","guid":{"rendered":"https:\/\/karidiyar.com\/?page_id=112"},"modified":"2023-08-09T15:32:31","modified_gmt":"2023-08-09T15:32:31","slug":"unloading","status":"publish","type":"page","link":"https:\/\/karidiyar.com\/?page_id=112","title":{"rendered":"Unloading"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">At Kari Diyar, our unloading division plays a vital role in receiving the essential fuel oil feed for our plant operations. The unloading system is designed with efficiency and productivity in mind, ensuring a seamless process. Let&#8217;s explore the unloading platforms at our plant:<br>1. First Platform: This platform is equipped with four pumps, enabling the simultaneous unloading of up to eight tankers. With this efficient setup, we ensure a swift and streamlined unloading process, optimizing our operational efficiency.<br>2. Second Platform: Our second platform features two pumps, capable of unloading up to six tankers simultaneously. This setup further enhances our unloading capabilities, ensuring a smooth and continuous flow of fuel oil to our plant.<br><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Overall Unloading Capacity: Collectively, our unloading division boasts an impressive total unloading capacity of 465 cubic meters per hour. This substantial capacity enables us to receive a significant volume of fuel oil efficiently, supporting our uninterrupted production processes.<br><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At Kari Diyar, we prioritize efficient and reliable unloading operations. With our state-of-the-art unloading platforms and advanced pumping systems, we ensure a smooth transition of fuel oil from tankers to our plant, guaranteeing uninterrupted production and optimal performance.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>At Kari Diyar, our unloading division plays a vital role in receiving the essential fuel oil feed for our plant operations. The unloading system is designed with efficiency and productivity in mind, ensuring a seamless process. Let&#8217;s explore the unloading platforms at our plant:1. First Platform: This platform is equipped with four pumps, enabling the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-112","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/karidiyar.com\/index.php?rest_route=\/wp\/v2\/pages\/112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/karidiyar.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/karidiyar.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/karidiyar.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/karidiyar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=112"}],"version-history":[{"count":2,"href":"https:\/\/karidiyar.com\/index.php?rest_route=\/wp\/v2\/pages\/112\/revisions"}],"predecessor-version":[{"id":155,"href":"https:\/\/karidiyar.com\/index.php?rest_route=\/wp\/v2\/pages\/112\/revisions\/155"}],"wp:attachment":[{"href":"https:\/\/karidiyar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}